Carried out projects (2010):

 

  • Steam pipeline repair
  • WNR canopy structure dismantling
  • Civil, piping and mechanical works - ELEKTROBUDOWA KATOWICE
  • Upgrading of existing storage tank system for petroleum products - OBR PR SA
  • Pipeline repair and upgrading - OBR PR SA
  • Assembly of tank heating coils BB028, BB029, BB048 - OBR PR SA
  • Assembly of maintenance platforms and supporting structures - PCC Rokita
  • Piping design and assembly for “Containment of vapors from tanks” unit – OBR PR SA

Current project:

  • Documentation preparation for UDT and GUM - OBR PR SA
  • Documentation preparation for tank upgrading - OBR PR SA
  • Developing of the steam pipeline system for aviation gasoline production usage – OBR PR SA
  • Documentation update for an automatic part of Catalytic Cracking II Unit
  • Documentation update for the storage tank 110 at the Crude Oil Storage Department

 

 

Carried out projects (2011):

 

  • registration documentation for storage thanks according to requirements of UDT (15 pcs.) and GUM (9 pcs.)
  • checking calculation for minimum allowable wall thickness of piping (5 pcs.)
  • instruments for energy media EO i GP
  • redesign of fireproof water piping
  • service platform for mantling and dismantling of heat exchanger AE-6
  • redesign of feed piping
  • redesign of distillation residue piping
  • inventory control of the heating network
  • redesign from unit "Gorzow" piping
  • repair of cooler CH-104

 Current project:

  • redesign of by-passes for pumps S-605/R, S-608/1.2.3, S-613/1.R basing on the project MN1582
  • piping system for new compressor DK-3
  • software and normative data base supervision
  • design of MSAR production unit 1000T trial
  • design of new dampers for KU-201 and KU-201M
  • redesign of lines 108/1 and 108/2 GP-1 LK-2 and line 110/2.101/5 GP-2 KT-1/1
  • design the necessary equipment and its servicing platforms in GP-2 S-001/1 territory according to the enclosed P&ID diagram